We’ve all seen the orange lift parked in various positions alongside the church tower for some weeks now. Phase 1 and 2 repairs featured obvious masonry repairs to the East face of our building. Phase 3 repairs, while just as important, are more…discreet. The valley area between our bell tower and main building, not viewable from the ground, was completely torn out and rebuilt with a slightly steeper pitch. This was covered with extensive sheets of copper flashing with thickly soldered seams.
The north face of the tower was entirely repointed, and an area of the roof retiled. We are happy to be nearing the end of this Phase and ensuring a watertight roof once again.
No comments:
Post a Comment