Our final Phase 2 repairs were conducted “beyond the scenes.” Our East tower clock face needed securing. High up inside the tower, Joseph Gnazzo Company Inc. installed a stainless steel tie rod with sock anchors behind the clock face. An internal wall crack was also repaired with jet-cleaning, pointing and injection grouting.
No comments:
Post a Comment